Year 2018


  • Jan 2018 Obtained Certificate of Substantial Completion on 9th Jan 2018 for the Development of Food Hub Complex at Senoko Drive/Senoko Loop.
  • Feb 2018 Secured LTA contract on 28 Feb 2018 for Additional and Alteration Works to Rail Facility Building.
  • Mar 2018 Obtained Final Completion Certificate on 1st March 2018 for Building Works at Jurong West Neighbouhood 1 Contract 30 and Contingency Works.
  • Apr 2018 TOP is obtained on 2nd Apr 2018 for Relocation and Erection of the 2 Storey Recreational Building with Single Storey Buggy Shed, a Guard House/Bin Centre and a 22KV Sub-Station only (excluding Golf Driving Range).
  • May 2018 TOP is obtained on 3rd May 2018 for Relocation and Erection of the 2 Storey Recreational Building with Single Storey Buggy Shed, a Guard House/Bin Centre and a 22KV Sub-Station and TOP for Driving Range Area, Maintenance Access Road to PES and Ball Retrieval Shed only.

 

 

Year 2017


  • Jan 2017

Secured LTA contract on 10th January 2017 for Relocation of Recreational Facility.
  • Mar 2017 Obtained Final Completion Certificate on 28th March 2017 for the Improvement to Roadside Drains at Charlton Park Estate.

  • Jul 2017

TOP is obtained on 7th Jul 2017 for Erection of a Food Hub Comprising a block of 7-storey multiple-user warehouse/facory building with ancillary facilities on Lots 01543X, 01545C and 01546M MK 13 at Senoko Drive.

 

 

Year 2016


  • Jan 2016

TOP is obtained on 7th Jan 2016 for Singapore Lee Clan General Association at Lot/s 97823A & 98776M T.S17 at 363 Jalan Besar Singapore 208994.
  • Jan 2016 Maintenance Certificate obtained on 27th Jan 2016 for Biosensors Project.
  • Jan 2016 Maintenance Certificate obtained on 28th January 2016 for A&A to Kian Ann Warehouse at No.7 Changi South Lane.
  • Mar 2016 Completion Certificate obtained on 11th March 2016 for A&A to the existing conserved 4-storey building at 363 Jalan Besar.
  • Aug 2016 Final Completion Certificate obtained on 31st August 2016 for A&A Works to Accommodation Buildings, Toilet and Mess at Upper Jurong Road.
  • Sep 2016 Final Completion Certificate obtained on 20th September 2016 for the Erection of a 3-Storey Operations Building at New Phoenix Park.
  • Sep 2016 Final Completion Certificate obtained on 23rd September 2016 for the Erection of 8-Storey Warehouse Retail Complex at Jurong East Street 11.
  • Nov 2016 Secured LTA Upgrading work (on 11th November 2016) at Permanent Way and Locomotive Workshop in Tuas Depot.

 

 

Year 2015


  • Jan 2015

TOP issued 2nd Jan 2015 for LinkBridge at Level 2 and Sky Terraces at Level 3 at Lot 8359W MK05 Jurong East Street 11.
  • Feb 2015  Maintenance Certificate obtained on 26th Feb 2015 on Lot 4182x & 4183L mk 06 at Corporation Road Blk 175.
  • Mar 2015         Jian Huang Joint Venture with Yongnam secured JTC Project for erection of a Food Hub Comprising A Block of 7-Storey Multiple-User Warehouse/Factory Building with ancillary facilities at Senoko Drive.
  • Oct 2015 CSC issued on 5th Oct 2015 for Biosensors Project.
  • Oct 2015 Maintenance Certificate obtained on 30th Oct 2015 for Benoi Sector Project.
  • Oct 2015 Maintenance Certificate obtained on 28th Oct 2015 for Lot 17622A mk 18 at Serangoon North Ave 5.

 

 

Year 2014


  • Jan 2014    TOP obtained on 29th Jan 2014 on Lot 4182x & 4183L mk 06 at Corporation Road Blk 175.
  • Apr 2014    TOP Obtained on 30th Apr 2014 at Lot 04584C mk 07 at Tuas South Street 8.
  • Aug 2014   TOP obtained on 19th August 2014 - Biosensors Project.

  • Oct 2014

  CSC obtained on 13th Oct 2014 - K&S Project.
  CSC obtained on 29th Oct 2014 - Teck Leong Project
  • Nov 2014   TOP obtained on 11th November 2014 - Big Box Project.
  CSC obtained on 3rd Nov 2014 - Benoi Sector Project.

 

 

Year 2013


• Jan 2013 Teck Leong Industries Pte Ltd awarded contract for erection of a Single-User 2-Storey Factory with   building with Ancillary Office at Tuas South Street 8.
• Feb 2013   CSC obtained on 20 Feb 2013 on Lot 02456T MK 2 at 22 Jalan Kupang.
• June 2013   CSC obtained on 17 June 2013 - Gold Kili Project.
• Sept 2013   TOP obtained on 23 Sept 2013 - HSL Project.
• Oct 2013   TOP obtaibed on 4 Oct 2013 - K & S Project.
• Nov 2013   TOP obtained on 6 Nov 2013 - Warehouse Building Project at Benoi Sector Project

 

 

Year 2012


• Jan 2012 Achieve SME1000 2012 Listing from DP Information Group
• May 2012 Mapletree Industrial Trust awarded contract for erection of a 5-storey Multi-user Industrial Building with Ancillary Offices at Serangoon North. The building will house the Singapore HQ of Kulicke Soffa, a US semiconductor equipment maker.
• May 2012 Kian Ann Engineering Ltd awarded contract for addition and alteration of existing Part 3-Storey Part 5-Storey Single-User, Single Occupier Warehouse at Changi South Lane.
• May 2012 CSC obtained on 11 May 2012 - Suki Sushi Project.
• June 2012 TOP obtained on 27 June 2012 - Hoya Project
• Sept 2012 TOP obtained on 10 Sept 2012 - XMH Project
• Oct 2012 TOP obtained on 12 Oct 2012 on Lot 02456T mk 27 at 22 Jalan Kupang.

 

 

Year 2011


• Jan 2011 Achieve SME1000 2011 Listing from DP Information Group
• Feb 2011 JHC upgrade to BCA B1 CW02 Civil Engineering
• Mar 2011 Our group entered into a sale-and-leaseback arrangement with Mapletree Logistics Trust for the warehouse cum office building located at 15A Tuas Avenue 18, Singapore (Jian Huang Business Centre)
• Mar 2011  CSC obtained on 2 Mar 2011 at Lot 3931k mk 07 at 15A Tuas Ave 18.
• Apr 2011 Defence Science Technology Agency awarded contract for New Buildings at Nee Soon Camp and Maju Camp.
• Apr 2011 HDB awarded contract for 465 dwelling units at Jurong West N1C30 - Corporation Tiara.
• May 2011 TOP obtained on 27 May 2011 - Suki Sushi Project
• July 2011 National Environment Agency awarded contract for the Upgrading of Existing Market/Food Centre at Blk 353 Clementi Ave 2, Blk 4A Eunos Crescent & Blk 4A Jalan Batu under the Hawker Centres Upgrading Programme (HUP) - Batch 7.
• Aug 2011 JHC upgrade to BCA A1 CW01 General Building Contractor
• Aug 2011 Public Utilities Board awarded contract for Improvement to Roadside Drains at Charlton Park Estate.
• Aug 2011 Gold Kili Trading Enterprise (S) Pte Ltd awarded contract for Addition and Alteration Works to existing building at Woodlands Link.
• Sept 2011 Ministry of Home Affairs awarded contract for new Erection of Operations Building at Phoenix Park.
• Sept 2011 XMH Holdings Ltd Group awarded contract for extension of existing factory at Sungei Kadut.
• Sept 2011 Takasago awarded contact for erection of Class 1 Clean Room at Tampines Industrial Ave 5 for Hoya.
• Nov 2011 HSL Constructor Pte Ltd awarded contract for erection of a 5-storey Industrial Building with Ancillary Office & Mezzanine Carpark Floors at Penjuru Road.

 

 

Year 2010


• Jan 2010 Achieve S1000 2010 Listing from DP Information Group
• Mar 2010   CSC obtained on 9 Mar 2010 - Teck-Link Project.
• Mar 2010 TOP obtained on 10 March 2010 - I-Park Project
• Mar 2010  CSC obtained on 5 Mar 2010 on Lot 02878m mk5 at 50 Cheng Soon Garden.
• Jun 2010 JH Projects upgrade to BCA A2 CW01 General Building
• Jun 2010   CSC obtained on 7 June 2010 at Lot 6683T mk 23 at 35 Tai Seng Street.

 

 

Year 2009


• Jan 2009  CSC obtained on 29 Jan 2009 on Lot 4323l mk31 at Changi North Way.
• Apr 2009  CSC obtained on 13 Apr 2009 on Lot 6814 & 6821 at 11 Bedok North Ave/Upper Changi Road. 
• Apr 2009  TOP obtained on 27 Apr 2009 on Lot 3931k mk 7 at 15A Tuas Ave 18.
• Jul 2009  TOP obtained on 23 Jul 2009 on Lot 02878m mk5 at 50, Cheng Soon Garden.
• Sept 2009  TOP obtained on 2 Sept 2009 on Lot 03604x mk 7 at Tuas View Lane.
• Nov 2009 1st pile for Suki Sushi project
• Nov 2009  CSC obtained on 23 Nov 2009 on Lot 4153c mk 6 at No.15 Pioneer Walk.

 

 

Year 2008


• Jan 2008 Achieve SME500 2008 Listing from DP Information Group
• Jan 2008 TOP obtained on Lot 7948 mk5 at 46A Tanjong Penjuru Road.
• Feb 2008 TOP obtained on 1 Feb 2008 on Lot 2901x & 2525A mk6 at Jurong Port Road.
• Apr 2008 TOP obtained on 4 Apr 2008 on Lot 6130p mk23 at Ubi Road 3/ Ubi View.
• Jul 2008 Win FG50 2007 Award
• Jul 2008  TOP obtained on 28 Jul 2008 on Lot 4323l mk 31 Changi North Way (Phase 1).
• Aug 2008  TOP obtained on 12 Aug 2008 on Lot 4153c mk 6 at 15 Pioneer Walk (Phase 1).
• Sept 2008  TOP obtain on 3 Sept 2009 on Lot 4323l mk31 at 15 Changi North Way (Phase 2).
• Oct 2008  TOP obtained on 10 Oct 2008 on Lot 4153c mk 6 at 15 Pioneer Walk (Phase 2).
• Nov 2008 JHC, JHB and JHP, con-currently obtain ISO 9001:2000, ISO 14001:2004 and OHSAS 18001:2007 certification
• Nov 2008 Signing Ceremony for first China project
• Dec 2008 Obtain Business License for JH Capital (Kunming) Pte Ltd (JHCK)
• Dec 2008 Ground breaking ceremony for first China project

 

 

Year 2007


• Jan 2007 Achieve SME500 2007 Listing (473rd placing) from DP Information Group
• Jan 2007 TOP obtained on 10 Jan 2007 on Lot 4150 , 7482 mk5 at 38 Tanjong Penjuru Road.
• Apr 2007 TOP obtained on 10 Apr 2007 on Lot 8136w mk5 at Penjuru Lane (Phase 2).
• May 2007 TOP obtained on 9 May 2007 on Lot 557 mk4 Namly Crescent.
• June 2007 TOP obtained on 13 June 2007 on Lot 4097w mk6 at 2 Fishery Port Road.
• Jul 2007  TOP obtained on 9 Jul 2007 on Lot 4097w mk6 at 2 Fishery Port Road (Plant and Cold room).
• Jul 2007 TOP obtained on 19 Jul 2007 on Lot 2525A & 2901x mk 6 at 37 Jurong Port Road.
• Jul 2007 JHB obtain BCA grade B2 CW01 General Building
• Oct 2007 Ms Annie Gan won Entrepreneur of the Year Award 2007
• Nov 2007 Win Enterprise 50 Award (8th placing)
• Nov 2007 TOP obtained on 5 Nov 2007 on Lot 2901 & 2525A mk6 (Top Cover) at Jurong Port Road.
• Dec 2007 TOP obtain on 28 Dec 2007 on Lot 6814 & 6821 mk 28 at Upper Changi Road / Bedok North Ave.
• Dec 2007 JHC upgrade to BCA A2 CW01 General Building
• Dec 2007 Obtain Certificate of Investment for JH Builders Vietnam Co. Pte Ltd (JHBV)

 

 

Year 2006


• Nov 2006 Win Enterprise 50 Award (22nd placing)
• Nov 2006 TOP obtained on 29 Nov 2006 on Lot 8814 mk27 at Changi South Lane.
• Dec 2006 JHB & JHP obtain ISO 9001:2000, ISO 14001:2004 and OHSAS 18001:1999 certification
• Dec 2006 JHP obtain BCA grade B2 CW01 General Building

 

 

Year 2005


• Jan 2005 JHC obtain ISO 14001:1996 and OHSAS 18001:1999 certification
 

Year 2002


• April 2002 JHC win its first Design-and-Build contract
• Jun 2002 JHC obtain ISO 9001:2000 certification
 

Year 1999


• Nov 1999 JHC obtain CIDB grade G2 CW02 Civil Engineering
 

Year 1998


• Jan 1998 JHC obtain CIDB grade G2 CW01 General Building
 

Year 1996


• Feb 1996 Inception of Jian Huang Group
• Jun 1996 Incorporate Jian Huang Construction Co Pte Ltd (JHC)